Wheaton College Performing Arts Center For this project, we assisted the general contractor with the demolition of the half of the old building and were an integral part of creating the new space. With the Performing Arts Center, the key was flexibility – every system...
Sherman Hospital During the COVID-19 pandemic, the Army Corps of Engineers, Chicago District and Turner Construction were looking for an electrical contractor to work around the clock to reopen a hospital that had been shuttered for more than a decade. With our...
Art Insitute of Chicago – Modern Wing During this project, Continental completed the Art Institute’s Modern Wing, taking the building out of the ground and completing the interior space. The building was designed to connect the current museum campus with Millenium...
University of Chicago During this project, Continental completed almost $8 million of electrical work to complete the historical renovation of an existing 100-year-old seminary building. To join this building, a new four-story building was erected. Continental worked...